Cabinet Refacing
Painting & Refinishing
Custom Cabinetry
Storage & Hardware
Countertops
Rooms We Fit
All Services
Get in Touch
Service Areas
Commercial casework
Edmonton commercial casework, built harder
A cabinet in a staff room gets opened more times in a year than a kitchen cupboard does in ten. That single fact drives most of what separates commercial casework from residential work, and almost none of it is visible from across the room.
- Hardware rated for cycles
- Thicker edge treatment
- Built to the named grade
The three grades
Economy, Custom and Premium
These are not adjectives, they are defined grades, and they describe workmanship, materials and installation tolerance on the surfaces that stay visible after fitting. The practical difference is how tight the gaps are, how flush the joints sit, and what the exposed material is allowed to be.
Economy is the minimum, and it is meant for woodwork out of public view: plant rooms, storage, back of house. Custom sits in the middle and is the default in the standards, which is why it covers most of a school, a clinic or an office without anyone needing to argue about it.
Premium is the top grade and is used selectively rather than throughout, on the pieces people stand a foot away from: reception counters, boardrooms, executive areas. See the commercial hub, office and retail and custom cabinetry.
How it works
How the Build Is Specified
-
Start from the named grade
The grade in the drawings sets the tolerances and the exposed materials. Everything downstream follows from it, so it is the first thing we read and the first thing we price.
-
Match hardware to traffic
A back-of-house cupboard and a public-facing drawer do not need the same slide. Cycle ratings get chosen per location rather than applied uniformly to make a quote look impressive.
-
Detail the edges and surfaces
Thicker banding and reactive adhesive where hands and trolleys land, hard-wearing surfaces on counters. These details cost little and decide how the room looks in year five.
-
Allow for accessible units
Where a counter has to be usable seated, the height and the clear knee space are set from the code, and exposed pipework under the sink is covered rather than left.
Under the finish
Where the Extra Money Actually Goes
Hardware first. Commercial drawer slides are tested to a minimum of fifty thousand open and close cycles, and the standard covering cabinet hardware puts hinges, pulls and slides through operational, cycle, strength and finish testing. A staff room drawer will exhaust residential hardware in a few years.
Then edges. Commercial work uses a thicker edge band, typically three millimetre, bonded with a reactive polyurethane adhesive that seals the edge against moisture and stops it lifting. Thin banding on a public counter peels at the corner first, and then it never stops peeling.
Surfaces get chosen for impact rather than appearance, which is why high pressure laminate turns up so often on counters that take trolleys and elbows. None of this is visible in a photograph, and all of it is visible in year five, which is the only fair test of a commercial fit-out. See hardware, slab doors and worktops.
Other commercial work
The Rest of Our Commercial Work
Casework specification is here. These are the project types it gets built for.
Multi-Unit Projects
Repeatable unit packages and delivery sequenced by floor.
Learn moreOffice & Retail
Reception counters, break rooms, display fixtures, cash wraps.
Learn moreCustom Cabinets
Built to your room, ceiling height and storage problem.
Learn moreSlab Doors
Flat fronts, handleless options, the finish carrying the look.
Learn moreSoft-Close
Noticed daily, and cheaper now than retrofitted later.
Learn moreQuartz
Non-porous, never sealed, unforgiving about a hot pan.
Learn moreCommon questions
Casework Questions, Answered
Grades, hardware, edges and what makes a commercial cabinet different.
Four years in the staff room and the drawers still run properly. Our previous fit-out was replacing slides inside eighteen months.
They read the grade off the drawings and priced it, then told me where Premium was not earning its cost. Useful conversation.
The accessible counter and the pipe covering were handled without me having to chase them. It passed inspection first visit.
Thicker edge banding on the public counters was their recommendation. The corners still look new, which is not true of the old ones.
From the blog
Edmonton cabinet guides
Grades, hardware ratings and specifying casework that lasts.
Ready to start
Price It Against the Spec
Send the drawings and we will price the grade they name, flag anywhere the spec and the budget disagree, and match hardware ratings to how each location actually gets used.
We'll assess the cabinets and send a written quote within one business day.