Cabinet Refacing
Painting & Refinishing
Custom Cabinetry
Storage & Hardware
Countertops
Rooms We Fit
All Services
Get in Touch
Service Areas
Multi-unit projects
Edmonton multi-unit cabinet packages
On a forty unit building, cabinetry stops being a design decision and becomes a logistics one. The same package repeats, the price is set by volume, and the only question that really matters is whether it lands on the right floor in the right week.
- Repeatable unit packages
- Delivery sequenced by floor
- One spec, priced by volume
Repeat the unit
One Package, Forty Times
The economics of a multi-unit job come from repetition. A small number of unit types, each with a fixed cabinet package, priced per unit rather than per kitchen. Every variation you allow into that mix costs more than it looks like it should, because it breaks the run.
That is not an argument for making every apartment identical. It is an argument for deciding the unit types early, then holding them. A two-bedroom package and a studio package covering a whole building will beat forty individually specified kitchens on both price and programme.
It also makes the building easier to maintain later. One door profile, one finish and one set of hardware means a damaged front is replaced from stock rather than matched, which is the difference between an hour of work between tenancies and two weeks of chasing a discontinued colour. See the commercial hub, slab doors and hardware.
How it works
How a Unit Package Is Set
-
Fix the unit types
Studio, one bed, two bed, accessible. Each gets one cabinet package. The number of types is the number that drives the price, far more than the total unit count does.
-
Price the package, not the kitchen
Quoted per unit type and multiplied out, so the developer can see exactly what a change to one package costs across the whole building before agreeing to it.
-
Build a control unit first
One unit fitted out and walked through before the rest goes into production. Anything wrong is wrong once instead of forty times, which is the cheapest hour on the project.
-
Release by floor
Delivery sequenced to framing and finish milestones rather than shipped complete. Site storage stays clear and the finish trades are not stepping around packaged cabinets.
Timing it
The Schedule Is the Whole Job
Larger projects want ordering three to twelve months ahead of the on-site date, and the number moves with size, unit mix and how much of the package is stocked rather than made. That lead time is not padding, it is what stops a finish trade waiting on a truck.
Delivery then gets sequenced rather than dumped. On a multi-building or high-rise job that means releasing by building or by floor to match framing and finish milestones, so units arrive as each floor is ready and nobody is storing forty kitchens in a car park.
The tradeoff is that changes get expensive once a run is in production, because a variant introduced halfway through has to be made as a separate batch at a separate price. Lock the packages early, then let the schedule do its work. See how commercial casework is built, worktops and office and retail.
Other commercial work
The Rest of Our Commercial Work
Unit packages are one kind of volume. These are the others.
Commercial Cabinetry
Grades, hardware cycle ratings and construction for public use.
Learn moreOffice & Retail
Reception counters, break rooms, display fixtures, cash wraps.
Learn moreSlab Doors
Flat fronts, handleless options, the finish carrying the look.
Learn moreQuartz
Non-porous, never sealed, unforgiving about a hot pan.
Learn moreSoft-Close
Noticed daily, and cheaper now than retrofitted later.
Learn moreBathroom Vanities
Comfort height against standard, built for a wet room.
Learn moreCommon questions
Multi-Unit Questions, Answered
Lead times, unit packages, delivery sequencing and change control.
Delivery by floor kept the site clear. On our last building we stored cabinets for six weeks and damaged a dozen of them.
One finish across ninety units means turnover repairs come off the shelf. That decision has paid for itself twice already.
They pushed us to cut from six unit packages to three. The price moved more than I expected and the programme got simpler.
The control unit caught a filler detail that would have been wrong in every apartment. Worth the week it cost us.
From the blog
Edmonton cabinet guides
Unit packages, lead times and sequencing delivery on larger projects.
Ready to start
Send the Unit Mix
Give us the unit types and the programme dates and we will price per package, propose a delivery sequence by floor, and tell you where a variant is costing more than it is worth.
We'll assess the cabinets and send a written quote within one business day.