Multi-unit projects

Edmonton multi-unit cabinet packages

On a forty unit building, cabinetry stops being a design decision and becomes a logistics one. The same package repeats, the price is set by volume, and the only question that really matters is whether it lands on the right floor in the right week.

  • Repeatable unit packages
  • Delivery sequenced by floor
  • One spec, priced by volume

Repeat the unit

One Package, Forty Times

The economics of a multi-unit job come from repetition. A small number of unit types, each with a fixed cabinet package, priced per unit rather than per kitchen. Every variation you allow into that mix costs more than it looks like it should, because it breaks the run.

That is not an argument for making every apartment identical. It is an argument for deciding the unit types early, then holding them. A two-bedroom package and a studio package covering a whole building will beat forty individually specified kitchens on both price and programme.

It also makes the building easier to maintain later. One door profile, one finish and one set of hardware means a damaged front is replaced from stock rather than matched, which is the difference between an hour of work between tenancies and two weeks of chasing a discontinued colour. See the commercial hub, slab doors and hardware.

Recent work
Dark wood and white gloss cabinetry around a seated island
Light wood cabinets with white gloss uppers and a breakfast bar

How it works

How a Unit Package Is Set

  1. Fix the unit types

    Studio, one bed, two bed, accessible. Each gets one cabinet package. The number of types is the number that drives the price, far more than the total unit count does.

  2. Price the package, not the kitchen

    Quoted per unit type and multiplied out, so the developer can see exactly what a change to one package costs across the whole building before agreeing to it.

  3. Build a control unit first

    One unit fitted out and walked through before the rest goes into production. Anything wrong is wrong once instead of forty times, which is the cheapest hour on the project.

  4. Release by floor

    Delivery sequenced to framing and finish milestones rather than shipped complete. Site storage stays clear and the finish trades are not stepping around packaged cabinets.

Timing it

The Schedule Is the Whole Job

Larger projects want ordering three to twelve months ahead of the on-site date, and the number moves with size, unit mix and how much of the package is stocked rather than made. That lead time is not padding, it is what stops a finish trade waiting on a truck.

Delivery then gets sequenced rather than dumped. On a multi-building or high-rise job that means releasing by building or by floor to match framing and finish milestones, so units arrive as each floor is ready and nobody is storing forty kitchens in a car park.

The tradeoff is that changes get expensive once a run is in production, because a variant introduced halfway through has to be made as a separate batch at a separate price. Lock the packages early, then let the schedule do its work. See how commercial casework is built, worktops and office and retail.

Logistics
An oak and black office credenza beside a meeting table
Oak slab doors with a white worktop along a single wall

Common questions

Multi-Unit Questions, Answered

Lead times, unit packages, delivery sequencing and change control.

Three to twelve months out from the required on-site date, depending on size, unit mix and how much is stocked. Larger and more varied projects sit at the long end of that.
Repetition is what creates the saving, so we price per unit type and multiply. Fewer types and a fixed spec produce a better number than the same total count spread across many variants.
They can, and each additional variant costs more than it appears to because it interrupts the production run. The usual answer is a small number of packages held firmly.
Yes, and on anything sizeable you should. Releasing by building or floor to match framing and finish milestones keeps site storage clear and stops cabinets being handled twice.
Possible before a run enters production, awkward and costly afterwards. This is the main reason we push to lock packages early and build a control unit before volume starts.
Because a walk-through of a finished unit finds things a drawing cannot. Fixing a detail once beats discovering it in every apartment after the trucks have already gone out.
It helps considerably. One door profile and one finish across a building means a damaged front is swapped from stock between tenancies rather than matched or replaced as a set.

Client reviews

What Edmonton Developers Say

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

Delivery by floor kept the site clear. On our last building we stored cabinets for six weeks and damaged a dozen of them.

Léopold M.
Developer, Edmonton
★★★★★

One finish across ninety units means turnover repairs come off the shelf. That decision has paid for itself twice already.

Sunita R.
Property manager, st. Albert
★★★★★

They pushed us to cut from six unit packages to three. The price moved more than I expected and the programme got simpler.

Callista B.
Development manager, Sherwood Park
★★★★

The control unit caught a filler detail that would have been wrong in every apartment. Worth the week it cost us.

Idris K.
Construction manager, Edmonton

Ready to start

Send the Unit Mix

Give us the unit types and the programme dates and we will price per package, propose a delivery sequence by floor, and tell you where a variant is costing more than it is worth.