Cabinet Refacing
Painting & Refinishing
Custom Cabinetry
Storage & Hardware
Countertops
Rooms We Fit
All Services
Get in Touch
Service Areas
Service area
Leduc countertops, templated properly
Quartz, granite and backsplash, measured after the cabinets are set and levelled rather than before. That single piece of sequencing is what separates a worktop that fits from one that has to be recut.
- Templated on set cabinets
- See the slab before cutting
- Seams placed, not accepted
The sequence
Cabinets First, Then the Stone
A worktop is templated on the cabinets that will carry it, once they are set, scribed and levelled. Measure earlier, off the old units or off a drawing, and you have made a piece of stone to fit a kitchen that no longer exists or does not exist yet.
That is the most expensive mistake available in this trade, because stone cannot be stretched and a recut slab is a new slab. It is also entirely avoidable, and it is why we will not template early even when someone asks us to save a week.
Four things lock at template and are difficult to change afterwards: edge profile, seam placement, overhang and sink reveal. We walk through all four on site with you rather than sending a form, because each one is easier to picture standing in the room. See how templating works, quartz and granite.
What to expect
A Leduc Worktop, Step by Step
-
Choose the material honestly
Quartz never needs sealing but marks under a hot pan. Granite takes the heat and wants sealing every year or two. How you cook decides this, not how it photographs.
-
See the actual slab
With natural stone especially. A small sample cannot show movement, veining or a darker band through one end, and what arrives is that specific slab.
-
Template on set cabinets
Edge profile, seam placement, overhang and sink reveal all agreed on site with the cabinets already levelled. Nothing is cut before this visit.
-
Fit, seam and seal
Installed, seams joined and polished, sink and tap cutouts finished, and granite sealed before handover with the water test shown to you.
Quartz or granite
They Fail in Different Ways
Quartz is engineered and non-porous, so it never needs sealing and does not stain. Its weakness is heat: the resin binding it softens, and a pan straight off the hob leaves a mark that does not come out. If you cook on gas and put pans down without thinking, that matters.
Granite is natural stone with nothing in it to soften, so heat is a non-issue. In exchange it is porous and wants sealing roughly every one to two years, a twenty minute job for a whole kitchen that people forget rather than find difficult.
Neither is better than the other. They are two different maintenance stories, and the honest way to choose between them is to think about how you actually cook rather than about which one looks best under showroom lighting. See quartz, granite and backsplash options.
Stone and walls
Worktops and Walls in Leduc
Stone, backsplash and the cabinetry underneath that has to be right first.
Countertops
Templating, seams and fitting, and when each one happens.
Learn moreQuartz
Non-porous, never sealed, unforgiving about a hot pan.
Learn moreGranite
Takes heat, wants sealing, and no two slabs are alike.
Learn moreBacksplash
Four inch or full height, and why the hob wall differs.
Learn moreCustom Cabinetry
The run underneath, built and levelled before templating.
Learn moreCabinet Refacing
New fronts with a new worktop, done as one project.
Learn moreCommon questions
Leduc Worktop Questions, Answered
Materials, sealing, templating and what locks when.
They refused to template until the cabinets were in and levelled. Our neighbour's fitter did it early and the stone had to be recut.
Sent me to see the slab. There was a dark band through one end and we planned the island around it deliberately.
I cook on gas and they steered me to granite, explaining exactly why quartz would not survive how I use the hob.
Seam placement was discussed rather than just happening. It falls where nobody looks, which I would not have thought to ask for.
From the blog
Edmonton cabinet guides
Materials, sealing schedules and getting the template sequence right.
Ready to start
Template a Leduc Worktop
Cabinets set and levelled first, then the stone measured on them. Edge, seams, overhang and sink reveal all agreed at the same visit.
We'll assess the cabinets and send a written quote within one business day.