Edmonton countertops, templated after the cabinets
Worktops come last for a reason. A template taken off old cabinets will not fit new ones, so the stone is measured once the cabinetry is in and level. Four pages here cover the materials, the timeline and the backsplash.
- Templated on set cabinets
- Seams agreed before cutting
- Overhang support planned
What we fit
Four Ways to Finish the Worktop
The two common stones, how the process runs, and the wall behind it.
Countertops
Templating, seams, edge profiles and the four decisions locked on template day.
Learn moreQuartz
No sealing, consistent pattern, and one real limitation around heat.
Learn moreGranite
Natural stone that takes heat, in exchange for sealing every year or two.
Learn moreBacksplash
Four inch against full height, what each costs and which suits the room.
Learn moreQuartz or granite
Sealing and Heat Split the Two
Installed, granite runs roughly $40 to $100 a square foot and quartz $50 to $120, so granite is usually $10 to $20 cheaper on a comparable slab. Example ranges, not quotes. Over the life of the worktop the totals end up close, because granite asks for sealing every year or two and quartz asks for nothing.
Heat is where they genuinely differ. Granite is natural stone and takes very high temperatures without complaint. Quartz is stone bound in resin, and the resin is the weak point, so a pan straight off the hob can mark it. A trivet solves that, but only if you use one.
So the choice is rarely really about price at all. It comes down to which small habit you would rather live with: sealing a worktop every year or two, or remembering to reach for a trivet before a pan goes down. Neither is difficult, and people know which one they will actually do. See granite, how templating works and backsplash options.
How it works
How a Worktop Reaches Your Kitchen
-
Cabinets set and levelled
Nothing is measured until the cabinetry is in and level. A template taken early fits a kitchen that no longer exists by the time the stone is cut.
-
Template on site
Laser or physical strips, capturing every cutout, overhang and out-of-square wall. Edge profile, seam placement, overhang and sink reveal are all agreed on that visit.
-
Fabrication
One to two weeks in the shop: slab cut, edges shaped and polished, cutouts made and seams prepared. This is the part nobody can compress.
-
Fit and finish
Installed, seams joined and polished, then sealed if the material needs it. Three to six weeks from template to fitted is the normal window.
Common questions
Countertop Questions, Answered
Materials, timeline, sequencing and what gets decided when.
They showed me exactly where the seam would fall before anything was cut. It sits behind the tap where I genuinely cannot see it.
I wanted quartz and cook on gas a lot. They explained the heat limit honestly and I went granite instead. Right call.
Templated only once the cabinets were level. Another company had offered to measure a fortnight earlier, which I now understand would have been a disaster.
Five weeks from template to fitted, which they quoted as five weeks. The shop time is the shop time and nobody pretended otherwise.
From the blog
Edmonton cabinet guides
Materials, templating and the decisions that get locked on template day.
Ready to start
Price a Worktop With the Cabinetry
Quoted alongside the cabinet work so you can see both, and templated only once the cabinets are set and level. Samples brought to you before anything is ordered.
We'll assess the cabinets and send a written quote within one business day.